The Ernest Rutherford Physics Building, named after one of McGill's most famous radiation physicists, was constructed in 1977 to provide this department with modern labs and equipment.ÌýThe Rutherford Building consists of prefabricated concrete slabs attached to a steel frame.
Special precautions were taken to make the building as tremor free and stable as possible due to the nature of the experiments carried out here. The concrete is of a texture and colour that blends with the rest of the McGill campus structures.
The only element of decoration in this functional building is the regular fenestration of tinted grey panels. The ground floor contains offices and large lecture rooms while the upper storeys are given to offices and labs, some quite specialized.Ìý
Project Description:
This project aims to transform room 025 in the Rutherford Building. This work includes separating the room into two distinct areas, installing walls with double doors in between, replacing the existing door with double doors, replacing existing sheet flooring.Ìý
Project Scope:
Room 025: separating room into two distinct areas, installing wall with double doors in between, replacing existing door with double doors, replacing existing sheet flooring
018, 020x and 020: No renovations.
Project Details:
Status | Execution |
Est. Project Start Date | 2024 - 2026 |
Est. Budget Range | $500,000 - $600,000 |
Location | Rutherford Physics Building, Building 189 |
Project Number | 19-117 |
Contact | map.procurement [at] mcgill.ca |
Please read the following information carefully :
Sustainable Procurement
The businesses with which the University will conclude a contract with in the course of this project will have to respect the McGill Supplier Code of Conduct.
Other requirements may apply, such as (for example): the quantification and limiting of GHG emissions over the contract or asset lifecycle, sustainable construction/product certifications, involvement of indigenous businesses or of social economy businesses, design for circularity, and so on.
Notice :Information in this document is not to be interpreted as a commitment to conduct any solicitation in any particular market (or to fulfill any particular need) within any timeframe. This document is based on preliminary assessments which may be modified and needs may consequently be increased, partially fulfilled or cancelled. The needs of the client units may fluctuate according to their capabilities and priorities. Moreover, this acquisition plan is subject to various risk factors that have an influence on the operations of Ï㽶ÊÓƵ, such as available revenue, inflation, changes in: provincial and federal policies, technologies, human resources, social movements and trends, demographic aspects of the student population and the academic personnel. |
Ìý