Strathcona Music - Pollack Hall Renovation

Type: Construction / Status: Design

Pollack Hall, located in McGill's Strathcona Music Building, is the Schulich School of Music's largest performance venue. Inaugurated in 1975, itÌýis named after Maurice Pollack and supported by the Pollack Foundation.Ìý

Strathcona Music Building, Ï㽶ÊÓƵ

The 600 seat hall has a green room, a large lobby and an adjoining lounge sometimes used for receptions. Approximately 400 concerts, lectures and other events are held annually in theÌýhall.

Read more aboutÌýPollack Hall | Music - Ï㽶ÊÓƵ

Pollack Hall Renovation

Project Description :

Interior renovation of Pollack Hall to modernize the hall’s functional and aesthetic design; improve its seating, lighting, acoustical performance and audiovisual capacity; renovation of the support spaces, such as the backstage and artist’s facilities; and upgrade of the HVAC systems.Ìý

Project Scope:

The key objectives of the project are to transform and modernize Pollack Hall’s functional and aesthetic design, to improve its seating, lighting, and audiovisual capacity, to renovate support spaces such as the backstage and artist’s facilities, and to upgrade the HVAC systems. The project scope also includes work originally identified in projects 14-148 (Strathcona Music Provide barrier free seating to the centre level) and 19-153 (Strathcona Music: Acoustical upgrade).

Ìý

A feasibility study was undertaken in 2020 to identify the Faculty's priorities, to validate the project scope within the allocated budget and to define a long-term intervention plan, as well as an implementation strategy that would minimize disruptions to the users.

Scope of work includes (but is not limited to):

  • Reconfiguration of the back of house spaces.
  • Replacement of mechanical units.
  • Renovation of the orchestra pit.
  • Renovation and improvement of overall accessibility of the Hall, including provision for barrier free seating.
  • Replacement of stage equipment.
  • Expansion and complete renovation of two washrooms.
  • Revamping of the East Lounge.

Project Details:

Project Status DesignÌý
Est. Project Start Date 2024-2026
Est Budget Range $20,000,000-$24,000,000
Location Strathcona Music Building BuildingÌý120
Project Number 19-167
Contact map.procurement [at] mcgill.ca

Please read the following information carefully :

Sustainable Procurement

The businesses with which the University will conclude a contract with in the course of this project will have to respect theÌýMcGill Supplier Code of Conduct.

Other requirements may apply, such as (for example): the quantification and limiting of GHG emissions over the contract or asset lifecycle, sustainable construction/product certifications, involvement of indigenous businesses or of social economy businesses, design for circularity, and so on.

Notice :

Information in this document is not to be interpreted as a commitment to conduct any solicitation in any particular market (or to fulfill any particular need) within any timeframe. This document is based on preliminary assessments which may be modified and needs may consequently be increased, partially fulfilled or cancelled. The needs of the client units may fluctuate according to their capabilities and priorities.

Moreover, this acquisition plan is subject to various risk factors that have an influence on the operations of Ï㽶ÊÓƵ, such as available revenue, inflation, changes in: provincial and federal policies, technologies, human resources, social movements and trends, demographic aspects of the student population and the academic personnel.