Ï㽶ÊÓƵ

Update:ÌýMarch 26Ìýat 6:50PM

- Washrooms on all floors in McLennan are now open.

- The Data Lab and microfiche viewing room on the second floor areÌýbothÌýre-opened.

- There are still some drying machines operating on the second floor but operations are mostly back to normal.

We thank you for your patience during these disruptions.

Classified as: building maintenance, water shutdown
Category:
Published on: 21 Mar 2018

Please note, there will be a City of Montreal water shutdown at the McLennan Library Building onÌýSaturday, February 24Ìýfrom 8am to 9am.ÌýAll six floors areÌýaffected.ÌýThis shutdown is necessary for the City of Montreal to install water meters in the building.

During this time, please use the washrooms located in the Redpath Library Building.

We apologize for any inconvenience. Thank you.

Ìý

Ìý

Classified as: water shutdown
Category:
Published on: 20 Feb 2018

Please be advised that there will be a City of Montreal water shutdown at the McLennan Library BuildingÌýon Thursday, March 2ÌýandÌýFriday March 3. ÌýThe shutdown will occur on both evenings from 10:00pmÌýuntil 7:00amÌýand will affect the entire building.

This shutdown is necessary for the City of Montreal to replace a major water valve on Sherbrooke Street.

During this time, please use the washrooms located in the Redpath Library Building.

We apologize for any inconvenience. Thank you.

Classified as: Construction, water shutdown
Category:
Published on: 27 Feb 2017
Back to top