The MTQ has made available a shuttle to take staff and students to and from the campus and the Farm for the duration of Phase 1 of the Macdonald Campus overpass construction.
The shuttle will run continuously from 08h00 – 12h00 and 12h30 – 17h00 and is equipped for bicycle transport. Each circuit takes approximately 10 to 15 minutes.
Stop locations include: