Ï㽶ÊÓƵ

Design Standards

These Standards apply to all new construction or renovation projects. They must be followed by all Professionals (Architects, Engineers, lighting consultant, acoustical consultant, etc.) for the preparation of their documents. McGill’s Standards are intended as a general rule for most circumstances and to provide direction to the Design Professionals. The purpose of these Standards is to assure maximum quality and value in construction projects at Ï㽶ÊÓƵ, through uniformity, system or component quality, compatibility, functionality, and ease of maintenance.ÌýIn addition, all construction projects on campus, regardless of scope or scale, will be executed following the sustainable principles of the LEED standard.Ìý

FORMS:

Ìý

DIVISION 0 – INSTRUCTIONS TO CONSULTANTS

00 00 01Ìý Table of ContentsÌýÌý - May 2023

00 10 00Ìý ÌýIntroductionÌý- September 2022

00 20 00Ìý ÌýInstructions to Consultants - September 2022

Ìý

DIVISION 1 – GENERAL REQUIREMENTS

01 56 00 Temporary Barriers and EnclosuresÌý Ìý- June 2023

01 60 00 Product Requirements - Apr 2021

01 74 19ÌýWaste Management and Disposal Ìý- August 2024

01 81 13ÌýÌýSustainable Design RequirementsÌýÌý- March 2024
01 81 16Ìý ÌýFacility Environmental Requirements - March 2024
01 83 16Ìý Exterior Enclosure Performance RequirementsÌýÌý- July 2024Ìý
01 84 19ÌýPDF icon Interior Finishes Performance Requirements - May 2017

01 86 00PDF icon Facility Services Performance Requirements - OctÌý2018
01 86 00ÌýÌýFile Fiche énergétiqueÌý- Nov 2017

01 86 01 PDF icon Appareils de Mesurage de l'Énergie (Débitmètres) - OctÌý2018

01 86 02ÌýPDF icon Appareils de mesurage en électricité (compteur électrique) - MarÌý2021
01 89 00ÌýPDF icon Site Construction Performance Requirements- May 2017

01 91 13Ìý Mise en service - exigences générales Ìý - May 2024
01 91 13ÌýPDF icon Tableau sélection mode mise en service - Mar 2021
01 91 13ÌýPDF icon Tableau service à rendre mise en service - Mar 2021

01 91 13ÌýPDF icon Tableau des Prix- Apr 2021

01 93 13Ìý Tableau des services à rendre en mise en service de l'enveloppe du bâtimentÌý Ìý AugustÌý 2024

01 93 13Ìý Ìý ÌýTableau des prix MES de l'enveloppe de bâtiment Ìý Ìý August 2024

SPECIAL BUILDING AREAS

Animal FacilitiesÌý Ìý September 2022
Classrooms, General Jan 2014
PDF icon Classrooms May 2020
Corridors and Hallways Ìý September 2023
CustodialÌý ÌýMarch 2023
ÌýElectrical RoomsÌý ÌýAugust 2024Ìý
PDF icon Entrance Vestibules May 2017
Laboratories March 2023
PDF icon LandscapeÌý - May 2019
ÌýMechanical Rooms ÌýAugust 2024Ìý
ÌýOffices - May 2024
RoofsÌý June 2023
Staff rooms JunÌý2015
PDF icon Stairs and RampsÌýSeptember 2022
Telecommunication Data Rooms Jan 2014
WashroomsÌý- July 2023

TECHNICAL STANDARDS
DIVISION 2 – EXISTING CONDITIONS

02 01 01 Tree Preservation - JulÌý2013
02 41 16ÌýÌýSelective Site Demolition/Deconstruction Ìý August 2024Ìý
02 80 00 Hazardous Materials - Oct 2014
02 82 15 Asbestos remediation - Dec 2017

DIVISION 3 – CONCRETE

03 30 00ÌýÌýÌýBéton coulé en place - September 2023

DIVISION 4 – MASONRY

04 05 10 PDF icon Common work for masonry- May 2017

DIVISION 5 – METALS

05 50 00 PDF icon Metal Fabrication - May 2017

DIVISION 6 – WOOD

06 10 10 PDF icon Rough Carpentry - May 2017
06 40 00 PDF icon Architectural WoodworkÌý- May 2017

DIVISION 7 – THERMAL & MOISTURE PROTECTION

07 21 00ÌýThermal Insulation Ìý- July 2024

07 52 00 PDF icon RoofingÌý- May 2017
07 52 00Ìý ÌýTableau – ÃŽlots de chaleur: Toitures -ÌýJune 2023
07 81 00 PDF icon Applied FireproofingÌý- May 2017
07 84 00 PDF icon Fire-stoppingÌý- May 2017
07 92 10 PDF icon Joint sealingÌý- May 2017

DIVISION 8 – DOORS AND OPENINGS

08 03 11 PDF icon Historic –Period wood doorsÌý- May 2017
08 11 14 PDF icon Metal Doors and FramesÌý- May 2017
08 11 16 PDF icon Aluminum Doors and framesÌý- May 2017
08 14 10 PDF icon Interior Flush wood doorsÌý- May 2017
08 33 36 PDF icon Side Folding Grilles - May 2017
08 35 14 PDF icon Accordion Folding DoorsÌý- May 2017
08 35 15 PDF icon Acoustic Folding DoorsÌý- May 2017
08 50 50Ìý Ìý WindowsÌý-Ìý June 2022
08 71 10ÌýHardware - July 2024

08 80 50 PDF icon Glazing - May 2017

DIVISION 9 – FINISHES

09 21 16 PDF icon Gypsum Board AssembliesÌý- May 2017
09 22 27ÌýPDF icon Suspended CeilingÌý- MarÌý2021

09 30 13Ìý ÌýCeramic TilingÌý- January 2024Ìý
09 65 16Ìý Resilient Sheet Flooring Ìý - March 2024Ìý
09 65 19ÌýResilient Tile Flooring Ìý - November 2023
09 68 00Ìý Carpeting - January 2024
09 84 10ÌýPDF icon Acoustic Treatment - Apr 2021
09 91 13 PDF icon Exterior PaintingÌý- Sep 2017
09 91 26 PDF icon Painting- May 2017

DIVISION 10 – SPECIALTIES

10 11 00 PDF icon Visual Display BoardÌý- May 2017

10 21 20 Toilet PartitionsÌý- June 2023

10 28 10Ìý PDF icon Washrooms accessoriesÌý- NovÌý2020

DIVISION 11 – EQUIPMENT

11 53 13 PDF icon Laboratory Fume Hoods - OctÌý2018

DIVISION 12 – FURNISHING

12 35 53ÌýPDF icon Laboratory Casework - October 2021

12 35 54ÌýPDF icon Chemical Storage Cabinets - Oct 2018

12 48 20 PDF icon Foot grillesÌý- May 2017
12 50 00 PDF icon Furniture -ÌýMay 2017
12 50 10ÌýÌýPodiums ÌýNovÌý2017
12 51 30Ìý PDF icon Window coveringsÌý- June 2020

12 93 23ÌýÌýTrash and Litter ReceptaclesÌý- June 2023

DIVISION 14 –CONVEYING EQUIPMENT

14 21 23Ìý Elevators March 2023Ìý

DIVISION 21 – FIRE SUPPRESSION

21 07 18 Fire Supression- Calorifugeage - Jan 2014

21 13 00 Sprinkler Systems - Jan 2014
21 13 10 PDF icon Portable fire extinguishers and fire hoses - May 2017

21 13 13Ìý PDF icon Wet pipe sprinkler systemÌý- Nov 2020
21 30 00 Fire Pumps - Jan 2014

DIVISION 22 – PLUMBING

22 00 00ÌýÌýPlomberieÌý -September 2022
22 05 00 Plomberie - Exigences générales concernant les résultats des travaux - September 2022
22 05 29 Plomberie - Fixations Parasismique - Jan 2014
22 07 00 Plomberie - CalorifugeageÌý- September 2022
22 11 18 PDF icon Tuyauterie d'eau domestique - SepÌý2016
22 13 17 Plomberie -Tuyauteries d'évacuation et de ventilation - fonte cuivre plastique - September 2022
22 15 00 Plomberie -Réseaux d'air comprimé - Jan 2014

22 42 01Ìý Plomberie - appareils speciaux et traitement de l'eau - September 2022
22 42 02ÌýÌýPlomberie – appareils sanitaires – éviers et cuviersÌý- September 2022

22 42 03Ìý Plomberie - appareils sanitaires - lavabos, w.-c., urinoirs et douchesÌý -September 2022

22 47 00Ìý PDF icon Appareils sanitaires - Fontaines Refroidisseurs d'EauÌý- April 2019

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING

23 00 00Ìý Heating, Ventilation and Air Conditioning - September 2022

23 05 53ÌýPDF icon Identification des systèmes mécaniques et des dessins Ìý- April 2019

23 05 53ÌýPDF icon Identification des systèmes mécaniques - dessin seulement - April 2019

23 09 33ÌýEntraînement à fréquence variableÌý- February 2024

23 11 23Ìý PDF icon Laboratory piping for gasesÌý Ìý- NovÌý2020
23 38 17ÌýPDF icon Chemical Fume Hood - April 2019
23 82 23ÌýÌýUnités de ventilation de CVCAÌý- September 2022

DIVISION 25 - AUTOMATISATION INTÉGRÉE

25 00 00ÌýAutomation intégréeÌý- November 2023

25 40 00 PDF icon Lignes directrices pour la conception de centrale de refroidissement - SepÌý2016

DIVISION 26 – ELECTRICAL

26 00 00Ìý ÌýÉlectricitéÌýÌý- September 2022

26 05 01Ìý ÌýRelevés électriquesÌý - Septembre 2022
26 05 01ÌýÌýÌýRelevés électriques STD-E-001 rév. 12 – dessin seulementÌý-Septembre 2023

26 05 01ÌýRelevés électriques formulaire de traçage rév 5 (pdf)ÌýÌý - December 2023Ìý

26 05 01ÌýÌýRelevés électriques formulaire de traçage rév 5 (Word)ÌýÌý- December 2023

26 05 14Ìý Ìý - September 2022
26 05 21ÌýÌýFils et cables/0-1000 VÌý- June 2023Ìý
26 05 28Ìý Mise à la terreÌý- September 2022
26 05 29Ìý ÌýFixation parasismique - September 2022
26 05 31Ìý ÌýArmoires et boites de jonction, de triage et de répartition - September 2022
26 05 34Ìý ÌýConduits, fixations et raccords de conduitsÌý-ÌýÌýSeptember 2022
26 05 36Ìý Chemin de câblesÌý- September 2022
26 05 81Ìý MoteursÌý- December 2023
26 09 02ÌýPDF icon Appareils de comptage et appareils de mesure de tableaux de communication -Ìý Jan 2020

26 12 13Ìý Transformateurs à diélectrique liquide moyenne tension - September 2022Ìý

26 12 16_01ÌýÌýTransformateurs sec – primaire jusqu’à 600VÌý- September 2022

26 18 26Ìý Disjoncteurs à moyenne tensionÌý- September 2022

26 24 16Ìý ÌýPanneaux de distributionÌý- September 2022
26 24 19Ìý Centre de commande de moteursÌý- September 2022

26 25 00Ìý Barres blindées - September 2022

26 28 16Ìý Disjoncteurs à boitier moulé et sous air - September 2022

26 28 18Ìý ÌýProtection contre les fuites à la terre - September 2022
26 28 22Ìý ÌýSectionneurs - September 2022

26 29 10Ìý ¶Ùé³¾²¹°ù°ù±ð³Ü°ù²õÌý- September 2022
26 32 13Ìý Groupes électrogènes à moteur diesel - September 2022Ìý
26 50 00ÌýÌýÉclairageÌý- September 2022

26 56 19Ìý Exterior LightingÌý - September 2022

DIVISION 27 – COMMUNICATIONSÌý

27 01 40 Operation and Maintenance of Audio-Video CommunicationsÌý- February 2023

27 06 40 Schedules for Audio-Video Communications - November 2023

27 08 40 Commissioning of Audio-Video Communications November 2023

27 40 00 Audio-Video Communications (General) - February 2023

27 40 01 Scope of Work for Audio-Video Design - February 2023

27 40 02 Scope of Work for Audio-Video Installation - February 2023

27 40 03 Scope of Work for Audio-Video Maintenance and Repairs - February 2023Ìý

27 41 00ÌýAudio -Video System (General) - February 2023

27 41 01 Standard Audio-Video Products - February 2023

27 41 02 Standard Audio-Video Installation Practices - February 2023

27 41 03 Standard Audio-Video Automation System Implementation - February 2023

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 31 01Ìý Fire alarm systemsÌý- December 2023

DIVISION 31 - EARTHWORKS

31 05 16ÌýPDF icon Aggregate Materials - Apr 2021

31 11 00PDF icon Clearing and GrubbingÌý- Sep 2017
31 35 00ÌýPDF icon Natural Stone - May 2019

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 00 00 PDF icon Exterior ImprovementsÌý- SepÌý2017
32 00 00 Table/ Ilots de chaleur: surfaces autres que les toitures - Jan 2014
32 01 90ÌýPDF icon Tree and Shrub PreservationÌý- Sep 2017
32 11 23ÌýAggregate Base Courses Ìý-July 2024
32 12 16PDF icon Asphalt PavingÌý- Sep 2017
32 14 15Ìý ÌýPrefabricated Unit Paving - November 2022

32 15 40ÌýPDF icon Crushed Stone and Screening Surfaces - Apr 2021

32 31 00ÌýÌýFences and Gates Ìý Ìý- July 2024
32 37 00Ìý PDF icon Exterior Site Furnishings Ìý - July 2021

32 50 00ÌýGreen RoofsÌý- June 2023
32 91 19ÌýÌýTopsoil Placement and Grading Ìý- July 2024

32 92 19ÌýPDF icon Seeding Ìý- May 2019
32 92 23ÌýPDF icon Sodding - Apr 2021
32 93 10ÌýPDF icon Trees, Shrubs and Ground Cover Planting - Apr 2021
32 93 15ÌýPDF icon Hydraulic Transplanting - May 2019
32 93 43ÌýPDF icon Tree PruningÌý- Sep 2017

DIVISION 33 – SITE UTILITIES

33 40Ìý00Ìý PDF icon Rainwater ManagementÌý- Jan 2020

Back to top